Progress renovation Shopping center Brusselsepoort Maastricht

After the starting on April 2, 2019, the renovation of the Brusselsepoort shopping center in Maastricht is in full swing.

Share on social media

The new contours of the shopping center are slowly becoming visible both inside and outside. The renovation on the Artsenijstraat side has already been completed, complete with a new entrance, expansion of retail units and a car park. On the other side, the new supply court with new loading docks will be delivered this month. The interior of the shopping arcades has largely been stripped and step by step, in consultation with the tenants, the new shop fronts are placed and the new ceilings are being installed. The plan is that with the laying of the new tile floors at the beginning of the new year, the renovation Phase 1 will be completed.

AGS Architects.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *