Revitalisatie Vondersweijde – Oldenzaal
On Monday 4 September, the municipality, Aannemersbedrijf Niehof, Lammerink Installatiegroep and Reimink Zwembaden signed the contract for the revitalization of the Vondersweijde sports centre.
Apartments Carrefour Geleen
The registration for the purchase of the 21 Carrefour apartments on the Rijksweg in Geleen has started. The sale signs have been placed at the location.
Mondial College – Nijmegen
Because the current location of the Mondial College Leuvensbroek (mavo, havo, vwo) has become too cramped, the school will be relocated at Energieweg 93 in Nijmegen.
Sports hall De Marke Deventer
A new school and sports hall will be built at the Marke Zuid location in Deventer.
Sports hall De Koel – Borger
Sports hall De Koel in Borger is outdated and will be replaced by a new building. The municipality of Borger-Odoorn has issued a tender for this purpose.
Village house De Steiger Stampersgat
To make De Steiger Village house in Stampersgat future-proof, more multifunctional and more sustainable, the Village house will be renovated and expanded.
Progress renovation Shopping center Brusselsepoort Maastricht
After the starting on April 2, 2019, the renovation of the Brusselsepoort shopping center in Maastricht is in full swing.
Modular Construction system
Together with Kaynad, AGS Architects has developed a modular system that makes it possible to manufacture homes on an industrial scale. The modular building system can be compared to a building method based on a combination of the K’nex and Lego building systems. These two, originally toy systems, were our source of inspiration.
Shopping center Giesen Bautsch
AGS Architects has made the design for the new construction and partial renovation of the Giesen Bautsch shopping center in the municipality of Heerlen, located on Bautscherweg, Corisbergweg and Vullingsweg.